TR
Application
The TR is installed on the return line of the reservoir tank just before the reservoir tank to prevent contaminants from entering the tank.
Application
The TR is installed on the return line of the reservoir tank just before the reservoir tank to prevent contaminants from entering the tank.
Features
● Installed directly on the tank surface and able to be set for IN side piping only.● Air breather combination
Items |
Standard specifications |
Possible corresponding specifications / options, etc. |
Corresponding fluid |
Mineral oil |
Phosphate ester oil, water glycol oil |
Maximum working pressure |
0~1MPa |
- |
Indicator |
n/a |
Can modify with Visual type |
Relief valve (Bypass) |
Equipped |
<Must be equipped> |
Connection |
Rc threaded type | - |
Magnet |
- |
- |